Sanco Facilities Management FZE Call 24/7

Company profile · 2027 · Dubai, UAE

Kitchens, cooling and MEP — kept running.

Facilities management for restaurants, hotels and commercial buildings across the UAE. Six levels of service, from cleaning to full fit-out, under one group.

Scroll

About Sanco

One partner for every system your building relies on.

Sanco Facilities Management FZE specialises in MEP and HVAC services for commercial, hospitality, F&B, retail, residential and industrial clients. Our engineers and certified technicians design, install, commission and maintain air conditioning, kitchen ventilation, electrical, plumbing, pumps and water storage.

Maintenance and projects run as separate teams, so planned work never waits on project work.

15+years in the UAE
200+professionals
4,000+clients served
24/7emergency response

Figures across all Sanco Group companies.

Six levels · one group

Fresh air & cooling

Hot kitchen? The AC is often not the problem.

The kitchen exhaust pulls out a lot of air. The fresh air unit (FAHU) should replace most of it with treated, dry air. When it doesn't, hot and humid outside air is pulled in through every door and gap, and the AC can't keep up.

Kitchen exhaust100%
air out
Treated fresh air50%
air in
Pulled in from outside50%
hot, humid

Humidity rises, the AC runs flat out and the kitchen still feels hot.

AC duct cleaning · Sanco FM

Clean air, not just cold air.

Dust, grease and moisture build up inside supply ducts. In our climate that layer grows mould, and every time the AC runs it is blown into the room — a common trigger for allergies and asthma at home.

Restaurants & F&B6 months
Homes · at least12 months
Camera inspection, before and after photos
REPORT
Rotary brushing of supply and return ducts
CLEAN
HEPA negative air keeps dust out of the room
CONTAIN
Grilles washed, coil and drain pan cleaned, ducts sanitised
SANITISE

AC & MEP maintenance

Three types of AMC. Pick your cover.

01 · NON-COMPREHENSIVE

Parts as needed

Planned visits, labour and 24/7 call-outs. Spare parts are quoted when needed.

PPM & labour
Included
24/7 call-outs
Included
Spare parts
Quoted

Budget certainty

02 · SEMI-COMPREHENSIVE

Parts up to a limit

Everything in non-comprehensive, plus parts included up to an agreed amount, for example AED 1,000 per item.

PPM & labour
Included
Spare parts
Up to limit
Spares in our store
Yes

Budget certainty

03 · COMPREHENSIVE

Parts included

One fixed annual cost. Spares for your units are kept in our store, ready to fit.

PPM & labour
Included
Spare parts
Included
Spares in our store
Yes

Budget certainty

ON THE ROAD · 24/7

Fixed first, invoiced later.

Our on-call technicians carry a ladder, tools, refrigerant and the parts that fail most often. An emergency part is replaced on the spot, even on a non-comprehensive contract, and invoiced afterwards.

Response times

Safe on site. Fast when it matters.

Every call is logged and given a priority, so the most urgent problems are reached first. The same times apply to AC & MEP and kitchen exhaust contracts.

P1
EmergencyAC shutdown, exhaust or ESP down, smoke, fire alarm tripping
1–4 hrs*
P2
UrgentCooling issues, reduced suction, odour
2–8 hrs
P3
RoutineMinor faults and follow-up items
12–24 hrs

* Depending on the site location. Call-outs are free with every KES contract; parts and labour are charged separately.

Case study · KES technical AMC

From monthly breakdowns to planned care.

Nalu logoIlios logo
Nalu & Ilios
Al Hudayriyat Island, Abu Dhabi

Two busy restaurants whose kitchen exhaust stopped almost every month: VFD trips, worn bearings and failing motors, always during service. We moved them to monthly KES technical visits and replaced worn parts before they failed.

Before · breakdownsOne year
<1emergency call-out every 6 months, down from almost one every month.

Case study · Retrofit & fresh air

Allo Beirut, Al Hessa — fixing the heat at its source.

Allo Beirut logo

A 300 m² restaurant, too hot all summer. The exhaust took out 14,000 CFM while an untreated fresh air system put back 7,500, so about 6,500 CFM of hot, humid air was pulled in. We designed and installed a 12,000 CFM treated FAHU.

3D view of the Allo Beirut restaurant: kitchen hood lines, dining hall and the new fresh air unit
≈ 86tons of fresh-air load moved off the split units onto the treated FAHU
≈ 140kkWh of electricity saved per year (estimate)
AED 60kestimated saving per year
~5 yrspayback on the retrofit

Estimate based on 1.6 kW/TR before, splits cycling plus a 40 TR FAHU at 1.1 kW/TR after, AED 0.44/kWh. Indicative only.

How our teams work

From your call to the final report.

Every fault, on an AC system or a kitchen exhaust, follows the same seven steps with one named contact.

Call or flag

You call, or our cleaning team reports a fault. Logged and given a P1–P3 priority.

Inspect

A technician visits and finds the root cause.

Report & quote

A report with photos and an itemised quotation. Fire-safety items first.

Approve

Nothing starts without your go-ahead.

Prepare

Parts taken from stock or ordered, job scheduled, permits arranged.

Fix

Done by our own technicians and tested before we leave.

Close

A completion report is shared and the job is closed.

Planned maintenance & consumables

Filters, belts and bearings — on schedule.

Every AMC starts from a yearly calendar. With a consumables contract, the parts that wear out are replaced before they fail, at a fixed cost. Deep cleans are done in March and April, before the summer peak.

Bag filters · FAHU & AHU
MONTHLY
Carbon filters · kitchen exhaust
6 MONTHS
Belts · fans, FAHU, KES
YEARLY
Bearings · fans and motors
2 YEARS

Selected projects

What we built, and what went into it.

AED 4.25M+ in this selection alone. Tap a type of work to filter.

Sanco FM portal

Every unit has a history, and you can see all of it.

We run every contract on our own portal. Each asset carries its full record: visits, faults, quotations, what was approved, what it cost, and photos. It can be shared with you at any time.

CHW FCU 02Dining hall
PPM visit · No. 1112 Nov · filter, coil and drain pan cleaned
Included
Repair · Q-2610-11828 Oct · condensate pump replaced
AED 650
Observation15 Oct · drain slow, ceiling marks
Quoted
Repair · Q-2606-04103 Jun · valve actuator replaced
AED 1,180

Typical FM: asset list handed over once

Sanco: live register, updated every visit

Typical FM: history scattered in emails

Sanco: every visit and quote on one record

Typical FM: photos on a technician's phone

Sanco: before and after photos on the unit

Quick health check

Two minutes. Tick what's true.

Tick any that apply.0

Sectors & coverage

Where we work, and who for.

Restaurants & F&B

Restaurants, cafés, central kitchens, food courts

Hospitality

Hotels, serviced apartments, leisure

Commercial

Offices, towers, business parks

Retail

Malls, supermarkets, showrooms

Residential

Towers, villas, communities

Industrial

Warehouses, free zones

Coverage · all seven emirates

DubaiAbu DhabiSharjahAjmanUmm Al QuwainRas Al KhaimahFujairah
AD TEAM

Dedicated environmental services team in Abu Dhabi
Sanco Environmental Services has its own team based in Abu Dhabi, looking after sites across the emirate.

Why Sanco

F&B ventilation specialists

Hood, ESP and ecology unit expertise few MEP firms offer.

Engineering-led

Measured diagnosis and data-backed recommendations.

One accountable contractor

HVAC, kitchen ventilation and MEP under one roof.

Our own civil team

Foundations, openings and making good done in-house, so you never appoint a separate civil contractor.

Spares in stock, 24/7 on the road

Common parts travel with the technician.

Complete transparency

Every unit's history, with photos and prices, on our portal.

15+ years in the UAE

Part of the Sanco group, with 200+ professionals.

Contact

Let's keep your kitchen running.

Ask for a site survey, an AMC proposal or a KES inspection. Our engineers will send a clear, itemised proposal.

Call+971 4 263 7073
+971 52 864 1667
WhatsApp+971 52 864 1667 · 24/7
Emailinfo@sancouae.com
Webwww.sancouae.com
OfficeAl Qusais Plaza, Damascus Street, Al Qusais Industrial Area 2, Dubai

Sanco Facilities Management FZE · Company profile 2027