Parts as needed
Planned visits, labour and 24/7 call-outs. Spare parts are quoted when needed.
- PPM & labour
- Included
- 24/7 call-outs
- Included
- Spare parts
- Quoted
Budget certainty
Company profile · 2027 · Dubai, UAE
Facilities management for restaurants, hotels and commercial buildings across the UAE. Six levels of service, from cleaning to full fit-out, under one group.
About Sanco
Sanco Facilities Management FZE specialises in MEP and HVAC services for commercial, hospitality, F&B, retail, residential and industrial clients. Our engineers and certified technicians design, install, commission and maintain air conditioning, kitchen ventilation, electrical, plumbing, pumps and water storage.
Maintenance and projects run as separate teams, so planned work never waits on project work.
Figures across all Sanco Group companies.
Six levels · one group
Fresh air & cooling
The kitchen exhaust pulls out a lot of air. The fresh air unit (FAHU) should replace most of it with treated, dry air. When it doesn't, hot and humid outside air is pulled in through every door and gap, and the AC can't keep up.
Humidity rises, the AC runs flat out and the kitchen still feels hot.
AC duct cleaning · Sanco FM
Dust, grease and moisture build up inside supply ducts. In our climate that layer grows mould, and every time the AC runs it is blown into the room — a common trigger for allergies and asthma at home.
AC & MEP maintenance
Planned visits, labour and 24/7 call-outs. Spare parts are quoted when needed.
Budget certainty
Everything in non-comprehensive, plus parts included up to an agreed amount, for example AED 1,000 per item.
Budget certainty
One fixed annual cost. Spares for your units are kept in our store, ready to fit.
Budget certainty
Our on-call technicians carry a ladder, tools, refrigerant and the parts that fail most often. An emergency part is replaced on the spot, even on a non-comprehensive contract, and invoiced afterwards.
Response times
Every call is logged and given a priority, so the most urgent problems are reached first. The same times apply to AC & MEP and kitchen exhaust contracts.
* Depending on the site location. Call-outs are free with every KES contract; parts and labour are charged separately.
Case study · KES technical AMC
Two busy restaurants whose kitchen exhaust stopped almost every month: VFD trips, worn bearings and failing motors, always during service. We moved them to monthly KES technical visits and replaced worn parts before they failed.
Case study · Retrofit & fresh air
A 300 m² restaurant, too hot all summer. The exhaust took out 14,000 CFM while an untreated fresh air system put back 7,500, so about 6,500 CFM of hot, humid air was pulled in. We designed and installed a 12,000 CFM treated FAHU.
Estimate based on 1.6 kW/TR before, splits cycling plus a 40 TR FAHU at 1.1 kW/TR after, AED 0.44/kWh. Indicative only.
How our teams work
Every fault, on an AC system or a kitchen exhaust, follows the same seven steps with one named contact.
You call, or our cleaning team reports a fault. Logged and given a P1–P3 priority.
A technician visits and finds the root cause.
A report with photos and an itemised quotation. Fire-safety items first.
Nothing starts without your go-ahead.
Parts taken from stock or ordered, job scheduled, permits arranged.
Done by our own technicians and tested before we leave.
A completion report is shared and the job is closed.
Planned maintenance & consumables
Every AMC starts from a yearly calendar. With a consumables contract, the parts that wear out are replaced before they fail, at a fixed cost. Deep cleans are done in March and April, before the summer peak.
Selected projects
AED 4.25M+ in this selection alone. Tap a type of work to filter.
Sanco FM portal
We run every contract on our own portal. Each asset carries its full record: visits, faults, quotations, what was approved, what it cost, and photos. It can be shared with you at any time.
Typical FM: asset list handed over once
Sanco: live register, updated every visit
Typical FM: history scattered in emails
Sanco: every visit and quote on one record
Typical FM: photos on a technician's phone
Sanco: before and after photos on the unit
Quick health check
Sectors & coverage
Restaurants, cafés, central kitchens, food courts
Hotels, serviced apartments, leisure
Offices, towers, business parks
Malls, supermarkets, showrooms
Towers, villas, communities
Warehouses, free zones
Coverage · all seven emirates
Dedicated environmental services team in Abu Dhabi
Sanco Environmental Services has its own team based in Abu Dhabi, looking after sites across the emirate.
Why Sanco
Hood, ESP and ecology unit expertise few MEP firms offer.
Measured diagnosis and data-backed recommendations.
HVAC, kitchen ventilation and MEP under one roof.
Foundations, openings and making good done in-house, so you never appoint a separate civil contractor.
Common parts travel with the technician.
Every unit's history, with photos and prices, on our portal.
Part of the Sanco group, with 200+ professionals.
Contact
Ask for a site survey, an AMC proposal or a KES inspection. Our engineers will send a clear, itemised proposal.
Sanco Facilities Management FZE · Company profile 2027